home *** CD-ROM | disk | FTP | other *** search
/ Aminet 40 / Aminet 40 (2000)(Schatztruhe)[!][Dec 2000].iso / Aminet / docs / mags / AIOV39.lha / AIOIssue39 / data / fe7.2 < prev    next >
Encoding:
Text File  |  1991-01-19  |  1.0 KB  |  26 lines

  1. First of all, remove your A1200 motherboard from the Power Tower and
  2. disconnect the normal power supply cable at the back, this will no
  3. longer be required and must {bold}NOT{nobold}be left in place.
  4. {p} {p}
  5. {center} {image gfx/Ateo-Pic-03.iff} {left}
  6. {p} {p}
  7. Now replace the motherboard into the tower as normal.
  8. {p} {p}
  9. When re-connecting any IDE Interface, ensure it is mounted as flat as
  10. possible on the floor of the tower and is secured, or else it could
  11. foul the Ateo Bus Board.{p}
  12. Here a standard 4-way Buffered Interface is
  13. shown neatly installed and secured down with cable ties passed through
  14. small holes drilled in the floor of the tower.  Also at this stage,
  15. remove any blanking plates that may be over the rear expansion
  16. slots and disconnect the Power Tower LED interface from the
  17. motherboard.
  18. {p} {p}
  19. {center} {image gfx/Ateo-Pic-04.iff} {left}
  20. {p} {p}
  21. Using the parts in the Kickstart Ateo Installation Kit, screw the
  22. posts to the mounting bracket, and then bolt the bracket to the Bus
  23. Board as shown in the photo.{p}
  24. {link fe7.3}Turn Page{end}
  25. {p} {p}
  26.